Soft Mobility Project To Cover 3 Dubai Areas #Dubai - Dubai City Guide
Guest Posts, Link Building, SEO, Pay-Per-Click campaigns
Advanced Search
Home / News / News Search
News Search
   

Soft Mobility Project To Cover 3 Dubai Areas
(25 January 2020)
The project links city components, promotes the use of public transport and supports ’First and Last-mile trips’


 

His Excellency Mattar Mohammed Al Tayer, Director-General and Chairman of the Board of Executive Directors of Dubai’s Roads and Transport Authority (RTA) announced that the initial phase of Dubai Master Plan for ‘Soft Mobility’ would be completed March 2020. He revealed that this phase covered three residential districts namely Karama, Mankhool, and Al Qusais 1. 

“The Soft Mobility Plan aims to develop a user-friendly and integrated transport infrastructure aimed at linking urban developments and catchment areas. The plan envisages the use of non-conventional transit means such as walking and cycling as well as the use of electric scooters. It addresses first and last-mile challenges by providing an infrastructure that supports the integration of mobility such as the construction of cycling tracks, pedestrian crossings and rest areas, shaded paths, landscaped areas, parking for rented cars, and bike racks,” said Al Tayer. 

Connecting the city 

“RTA has commissioned a comprehensive car-free mobility study in Dubai. Which focused on providing an infrastructure suitable for relatively long and medium journeys to ensure safe and smooth transport for all. It sets a strategy for promoting the use of non-motorized transport modes, people-friendly infrastructure, and fostering an accessible environment for people of determination within the right-of-way. 

It also aims to connect various city components by easing mobility between developed and catchment areas. It addresses the needs of the first and last-mile challenge by using non-motorized modes like walking and biking. The plan sets guidelines for fostering the integration of transit means and implementation across RTA projects. 

Transport Integration 

The Soft Mobility project entails providing integrated transport elements such as serving the mobility of people of determination, constructing elevated pedestrian crossings and speed-calming devices, designating shared biking lanes, and providing bike racks as well as directional and cautionary signage. Elements also include the construction of adjusted pavements, routes shared by vehicles and non-motorized means, rest areas including landscaped and sitting places and shaded paths to encourage people to use flexible mobility means. 

Criteria 

The selection of areas for implementing the flexible mobility project was based on several parameters namely, availability of existing RTA projects, availability of public transit means, a high number of users, and population density. The selection criteria also considers the type of land use (residential, commercial or mixed), the condition of the existing pavements and pedestrian walkways, availability of shaded elements as well as crossing and biking facilities, and RTA’s  5-Year Plan for cycling tracks. 

Mobility Elements

Under the initial phase of the project covering three residential areas (Karama, Mankhool and Al Qusais 1), RTA constructed 314 elevated pedestrian crossings and 66 speed-calming devices. It designated shared pedestrian and biking lanes extending 33 km and shared routes for vehicles and non-motorized flexible transit means extending 52 km. It also added 2000 directional/cautionary signs, adjusted 77,000 square meters of pavements, built 21 rest areas and 7 shaded routes. 

The project involves the launch of Friendly Safe Streets; a new concept in Dubai that had been implemented for the first time in a small German city and the concept spread across Europe. It envisages the introduction of safe school zones, implementing speed-calming devices and safe crossings for pedestrians and cyclists at junctions together with seamless pavements. It also increased landscaped and shaded areas and seats to ensure smooth and integrated mobility in Dubai. 

The project works will continue in 2020 and next year at Barsha 1 and 2, Bateen, Baraha, Ras, Al Qusais 2, and Al Qusais Industrial. The number of covered by the flexible transport plan is set to increase to 27 by 2024. 

We accept Guest Posts


DubaiCityGuide.com is owned and managed by Cyber Gear



  All fields are mandatory
Your Name
Email
City
Country
Your Comments
 Max 250 characters - Word Count :
Image Verification
Change Image

     
 
email print
 

Sponsored By : PressReleaseNetwork.com           Sponsored Opportunities

       
       
   
       

Hotels hotels Check out Hotels in Dubai
Shopping shopping A complete Mall & Store Guide
Dining dining Eating out at the coolest spots
Sightseeing sightseeing Things to see & do
DCG Recommends dcg recommends Best of the best in Entertainment
News Alerts
News Alerts
Stay ahead with dubai news
dcg mobile
dcg Mobile
With you wherever you go
rss feed
RSS Feeds
Get the latest
dubai blog
Dubai Blog
Your space, your voice
sitemap
Sitemap
DCG at a glance