MBR Solar Park Reaches News Infrastructure Completion Phase #Dubai - Dubai City Guide
Guest Posts, Link Building, SEO, Pay-Per-Click campaigns
Advanced Search
Home / News / News Archive
News Archive
   

MBR Solar Park Reaches News Infrastructure Completion Phase
(1 April 2019)

 

The concrete base of the tower that is part of the Mohammed bin Rashid Al Maktoum, MBR, Solar Park, the largest single-site concentrated solar power, CSP, project in the world, has been completed.

Saeed Mohammed Al Tayer, Managing Director and CEO of Dubai Electricity and Water Authority, DEWA, inspected the construction work of the fourth phase of the solar park, based on the independent power producer, IPP, model with a capacity of 950MW costing up to AED15.78 billion.

Once built, the 260-metre structure will be the tallest solar power tower in the world.

Al Tayer was briefed on the progress of construction work by Abdul Hamid Al Muhaidib, Executive Managing Director of Noor Energy 1, a venture formed through a partnership between DEWA, Saudi Arabia’s ACWA Power and China’s Silk Road Fund to build the fourth phase of the park.

Al Muhaidib confirmed the completion of the concrete base that contains about 1,300 tonnes of steel rebar and concrete, equivalent to 20 percent of Paris’s Eiffel Tower. The concrete placed weighs over 19,000 tonnes, equivalent to the weight of 34 full A380s planes’ take-off weight with 555 passengers.

Al Muhaidib explained that 33 percent of the engineering work has been completed for the project, which is proceeding according to plan.

This project is the largest single-site solar IPP project in the world that combines CSP and photovoltaic technology. This phase will provide clean energy for 320,000 residences and will reduce 1.6 million tonnes of carbon emissions annually. The project, which will cover an area of 44 square kilometres, achieved several world records.

These include the world’s lowest CSP Levelised Cost of Electricity, LCoE, of US$7.3 cents per kilowatt-hour and the lowest LCoE for photovoltaic technology of 2.4 US cents per kilowatt-hour. Apart from being the tallest solar tower in the world, it will use 70,000 heliostats, and the largest thermal storage capacity of 15 hours, allowing for energy availability round the clock.

It will generate 5,000MW by 2030 with investments of up to AED50 billion. The 13MW photovoltaic first phase became operational in 2013. The 200MW photovoltaic second phase of the solar park was launched in March 2017 while the 200MW first stage of the 800MW photovoltaic third phase became operational in May 2018. The third phase will be completed in 2020.

We accept Guest Posts


DubaiCityGuide.com is owned and managed by Cyber Gear



  All fields are mandatory
Your Name
Email
City
Country
Your Comments
 Max 250 characters - Word Count :
Image Verification
Change Image

     
 
email print
 

Sponsored By : PressReleaseNetwork.com           Sponsored Opportunities

       
       
   
       

Hotels hotels Check out Hotels in Dubai
Shopping shopping A complete Mall & Store Guide
Dining dining Eating out at the coolest spots
Sightseeing sightseeing Things to see & do
DCG Recommends dcg recommends Best of the best in Entertainment
News Alerts
News Alerts
Stay ahead with dubai news
dcg mobile
dcg Mobile
With you wherever you go
rss feed
RSS Feeds
Get the latest
dubai blog
Dubai Blog
Your space, your voice
sitemap
Sitemap
DCG at a glance