DEWA Completes Engineering Studies For Hatta Hydroelectric Plant #Dubai - Dubai City Guide
Guest Posts, Link Building, SEO, Pay-Per-Click campaigns
Advanced Search
Home / News / News Search
News Search
   

DEWA Completes Engineering Studies For Hatta Hydroelectric Plant
(15 July 2018)

 

Dubai Electricity and Water Authority (DEWA) has completed the engineering studies related to the 250MW hydroelectric power station in Hatta, which will use the water stored in the Hatta Dam.

This is part of the AED58 million consultancy contract that DEWA awarded to France’s EDF Group in June 2017, and covers all design, hydro-geological, geological, environmental, geotechnical, and deep excavation studies. It also includes consultancy on deep-water tunnel designs, the upper reservoir and hydroelectric power station, the tender for material supply, supervision of construction work, site installation, on-site testing and commissioning.

The project is the first of its kind in the Arabian Gulf, with a total capacity of 250MW by hydroelectricity from water stored in the Hatta Dam, and a lifespan of up to 80 years.

 “As part of the “Dubai Clean Energy Strategy 2050”, launched by His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, we have launched several projects, including the hydroelectric power station, at a cost of AED 1.92 billion,” said HE Saeed Mohammed Al Tayer, MD & CEO of DEWA.

“In addition to being a low-cost reliable and efficient source of clean energy, hydropower is the most important source for energy storage. It is estimated that storage hydropower represents 99% of the world’s operational electricity storage. Other benefits include water security, flood control, drought management, irrigation, and recreation. Hydropower is one of the most flexible and sustainable renewable energy sources. It can be operated to provide base-load power, as well as peak-load supply through pumped-storage. However, estimates indicate the availability of approximately 10,000TWh/year of unutilised hydropower potential worldwide,” said Al Tayer.

The hydroelectric power station will generate electricity by making use of the water in the Hatta Dam, which can store up to 1,716 million gallons, and an upper reservoir that will be built in the mountain that can store up to 880 million gallons. The upper reservoir will be 300 metres above the dam level. During off-peak hours, turbines that use clean and cheap solar energy will pump water from the lower dam to the upper reservoir. During peak-load hours, when production costs are high, turbines operated by the speed of waterfall from the upper reservoir will be used to generate electricity and connect it to DEWA’s grid. The efficiency of power production will reach 90% with a 90-second response to demand for electricity.

We accept Guest Posts


DubaiCityGuide.com is owned and managed by Cyber Gear



  All fields are mandatory
Your Name
Email
City
Country
Your Comments
 Max 250 characters - Word Count :
Image Verification
Change Image

     
 
email print
 

Sponsored By : PressReleaseNetwork.com           Sponsored Opportunities

       
       
   
       

Hotels hotels Check out Hotels in Dubai
Shopping shopping A complete Mall & Store Guide
Dining dining Eating out at the coolest spots
Sightseeing sightseeing Things to see & do
DCG Recommends dcg recommends Best of the best in Entertainment
News Alerts
News Alerts
Stay ahead with dubai news
dcg mobile
dcg Mobile
With you wherever you go
rss feed
RSS Feeds
Get the latest
dubai blog
Dubai Blog
Your space, your voice
sitemap
Sitemap
DCG at a glance